Having amassed valuable knowledge in cooperating with overseas consumers, a specialised provider of a full assortment of chains, sprockets, gears, gear racks, V-belts, couplings and reducers, pto shaft, agricultural gearboxes….
Resources |
1. steel:Aluminum/Steel/Alloy metal/Stainless metal/Brass,copper,bronze and so on. 2. plastic: Abdominal muscles,POM,PE,PP,PVC,Pc,PMMA,Teflon,nylon and so forth. three. other folks: carbon fiber, glass,fiberglass, wooden, tough rubber and many others. |
Shade |
Silver, Grey, Black ,Gold or as client’s requirement |
Surface Roughness |
Ra0.8 ( without sharpening or grinding) |
Brand Technique |
laser engraving, CNC engraving, monitor-printing etc. |
Surface Finish |
Anodize sharpening zinc/nickel/chrome/gold plating, sand blasting, ect. |
Tolerance |
+/- .01–.05mm / can also be personalized |
CertificaOur business has strong financial power, builds up a technician crew contingent with higher quality, possesses the manufacturing assembly line of technicalization in China and best system checking on merchandise good quality and operates marketing networks throughout the country. te |
ISO9001:2015 |
Processing equipments |
CNC machining middle,NC lathe, Grinding equipment, Automatic lathe device, Traditional lathe device,Milling device,Drilling device,EDM,Wire-cutting machine,CNC bending equipment etc |
Testing equipment |
Coordinate measuring equipment,Graphic measuring instrument,Caliper and so forth |
Software |
Health care Instruments/Digital/ Industrial// Automation / motorcycle/3D printer |
Support |
OEM,ODM or as client’s requirement |
Trade Terms | FOB, CIF, EXW |
MOQ | 1Pcs |
Port | xiamen, or as client’s requirement |
Delivery | By air (DHL,UPS,Fedex,EMS and so on.),By Sea,Convey… |
Payment Strategy | T/T(bank transfer),L/C,paypal,western union, moneygram,escrow, income and so on |
Payment Phrases | fifty% just before generation, fifty% just before delivery |
Packing | internal box,numerous bins/master carton or as customer’s necessity |
Shipping time | 5-7days for Alanple time,five-25 days for manufacturing |
Packaging & Delivery
Packaging Particulars
one. inner packaging: plastic wrap, bubble bag, PE foam, EPE cotton,PP bag etc.
2. outer packaging: carton box, picket case, plate etc.
3. as for every customers’ necessity
Port
xiamen, or as client’s requirement
Direct Time :
Quantity(Parts) | one – 20 | 21 – 100 | a hundred and one – 1000 | >1000 |
Est. Time(times) | 5 | ten | twenty five | To be negotiated |
If there is anything I can help, make sure you really feel cost-free to get in touch with with me
Telephone: 15359322298