DUMP TRAILER Power UNIT-DOUBLE ACTING
Standard Description
This electrical power unit has a electrical power up electrical power down circuit with load holding on both A & B ports. A pressure compensatred movement management might be additional to circuit to manage the decent pace on the cylinder.
Distinctive Notes
one. This electrical power unit is of S3 duty cycle, i.e., non-continuous operation, thirty seconds on and 270 seconds off.
two. Clean all the hydraulic parts concerned in advance of set up of the power unit.
3. Viscosity in the hydraulic oil shoud be 15~46 cst, which should really also be clean and free of charge of impurities. N46 hydraulic oil is advised.
4. The energy unit really should be mounted horizontally.
five. Check the oil level inside the tank soon after the original working from the energy unit.
six. Oil altering is needed soon after the preliminary a hundred operation hours, afterwards once every 3000 hours.

DUMP TRAILER Electrical power UNIT- SINGLE ACTING
Standard Description
This electrical power unit features a electrical power up gravity down circuit. Start out the motor to extend the cylinder and activate the solenoid valve to retract the circuit. Manual override to solenoid valve may be provided if essential. Also a strain compen sated movement manage can be added for the circuit to manage the descent speed in the cylinder.
Remark: Please seek advice from our income engineer for the distinctive pump displacement, motor electrical power or tank capacity.
Specific Notes
one. This power unit is of S3 duty cycle, i.e., non-continuous operation, thirty seconds on and 270 seconds off.
2. Clean the many hydraulic parts concerned just before set up of the power unit.
3. Viscosity in the hydraulic oil shoud be 15~46 cst,which must also be clean and absolutely free of impurities.N46 hydraulic oil is suggested.
four. The energy unit needs to be mounted horizontally.
five. Check the oil level within the tank immediately after the preliminary operating of the power unit.
six. Oil shifting is required soon after the first a hundred operation hrs, afterwards as soon as each and every 3000 hours.