With thorough requirments, we can also build your specific made solution. a specialised supplier of a full range of chains, sprockets, gears, gear racks, V-belts, couplings and reducers, pto shaft, agricultural gearboxes….
Overview
Rapid Particulars
- Relevant Industries:
-
Hotels, Garment Shops, Developing Material Shops, Production Plant, Equipment Restore Outlets, Meals & Beverage Manufacturing facility, Farms, Cafe, Property Use, Retail, Meals Shop, Printing Shops, Building works , Power & Mining, Meals & Beverage Shops, Advertising and marketing Business
- Materials:
-
Metal
- Common:
-
ISO
- Location of Origin:Zhejiang, China
- Model Name:
-
OEM
- Product identify:
-
Good design and style small metal gear for CNC device
- Color:
-
Character
- Quality:
-
Substantial-Quality
- OEM:
-
Assistance
- Certification:
-
ISO9001
Provide Capacity
- Provide Capacity:
- a thousand million Unit/Units for each Thirty day period
Packaging & Shipping and delivery
- Packaging Specifics
- plastic bag+plywood box+in accordance to customers’ specifications
- Port
- HangZhou Or Ningbo
- Image Illustration:
-
Guide Time
: -
Amount(Units) one – one thousand >1000 Est. Time(times) forty five To be negotiated
On the web Customization
1 | Materials |
C45(one.0503),SS304(1.4517),SS316(1.4541),Q235(S235JR),Q345,C20,40Cr,POM,PA6,Aluminum,GG25, Qt900-two,qt600-three,qt800-2,qt500-7,9cr18mov,qt400-fifteen,20CRMNTI,42CRMO,Brass(Copper) —SPROCKETS/GEARS/CNC MACHINING Components/BUSHINGS/SHAFTS/PULLEYS/COUPLINGS
|
2 | Customized |
Drawing as common or accepted by client before production |
3 | Common |
ANSI ,ASA,DIN ,JIS ,BS, ( SATI, CHIARAVALLI, BEA,MARTIN, BROWNING,KANA) |
four | Heat Therapy |
Harden tooth, Carburizing and Quenching,Gas Nitriding |
five | Suface Treatment method |
Black Oxide, Black phosphating, Nickel plating,Chromium plating,Copper Passivation |
6 |
Method
|
Forging( casting)—lathe- teeth shaping—ending—oil washing—Packing ,produced by CNC equipment |
7 | Inspection |
All products are checked and tested totally during every operating treatment and right after the product is ultimately manufactured to make sure that the greatest top quality solution enter into the market place.
|
8 | Purpose |
Durable, bad issue Resistance |
9 | Delivery Time | In stock or about 30-fifty Days times |