In addition, WE CAN Produce Personalized VARIATORS, GEARED MOTORS, Electric MOTORS AND OTHER HYDRAULIC Goods According TO CUSTOMERS’ DRAWINGS. specialize in energy transmission items, CATV goods, mechanical seal, hydraulic and Pheumatic, and promotional goods. In the meantime, our merchandise are made in accordance to large quality expectations, and complying with the worldwide advanced common standards. Who we are quest
HangEPT XiHu (West EPT) Dis.HU (WEST LAKE) DIS. CARDANSEPTFT CO semiLTD has 15 a long time background periodWhen the EPTT manager Mr periodRony Du graduated from the university commahe alwaEPTTconcentrated his interest on the research and deveXiHu (West EPT) Dis.Hu (West EPT) Dis.ment commaproduction and product sales of the cardan shaft periodMr periodRony Du and his staff began from scratch commafrom a single lathe and a quite small purchase commastep by stage to expand up periodHe frequently mentioned to his team quotWe will only do one particular factor properly——to make the best cardan shaft quot period of time
HangEPT XiHu (West EPT) Dis.HU (WEST LAKE) DIS. CARDANSEPTFT CO period commaLTD was founded in 2005 periodThe registered capital is eight million commacovers an area of fifteen acres comma has 30 eXiHu (West EPT) Dis.sting staff period The business EPTTizing in the manufacturing of SWC comma SWP cross EPT coupling and drum tooth coupling periodThe company with manufacturing unit is located in the beautiful coast of EPTTi EPT –Hudai lparHangEPT EPTTnomic DeveXiHu (West EPT) Dis.Hu (West EPT) Dis.ment Zone Hudai EPTT Park rpar period
In orEPTTto turn into EPTT aposs leading cardan shaft 1-end remedy specialist supplier periodXiHu (West EPT) Dis.HU (WEST LAKE) DIS. CARDANSEPTFT impartial analysis and deveXiHu (West EPT) Dis.Hu (West EPT) Dis.ment of SWC gentle comma medium comma quick comma heavy Types cardan shaft have arrived at the major domestic degree periodEPT not only supporting domestic massive and medium-sized clients comma but also exported to the United States comma India comma Vietnam comma Laos comma Ukraine comma Russia comma Germany comma Britain and other international locations and regions periodIn the past 15 a long time comma EPT has accrued a EPTT of expertise comma learn from overseas EPTd EPT comma and to soak up and use the EPT aXiHu (West EPT) Dis.s has been enhanced numerous times comma so that the structure is maturing comma drastically enhanced performance interval
XiHu (West EPT) Dis.HU (WEST LAKE) DIS. belief colon quotContinuous innovation comma optimize the composition comma perseverance quot to EPT a large top quality of outstXiHu (West EPT) Dis.Hu (West EPT) Dis. cardan shaft producer periodWe alwaEPTTadhere to the ISO9001 top quality management technique comma from the particulars to begin comma stXiHu (West EPT) Dis.Hu (West EPT) Dis.rdize the manufacturing approach comma and to attain processing tools quotEPTTization comma numerical manage quot speedy increase in merchandise good quality periodThis Not only won the majority of buyers track record comma but also entry to peer recognition period of time We continue to strive to pursue colon quotfor buyers to EPT the biggest value comma for the employees to construct the ideal system quot comma will be capable to accomplish client and business mutually advantageous win earn scenario period of time
Why choose us quest
First commaselect uncooked material meticulously
The cross is the core ingredient of cardan shaft commaso the choice of material is particularly critical periodRaw supplies of the cross for ligEPTT Duty Dimension and Medium Responsibility Measurement commawe pick the 20CrMnTi EPTT EPT steel bar from SEPTGANG EPT periodBeing forged in 2500 ton friction push to make certain inside metallurgical framework commainspecting the geometric dimensions of each component to meet up with the drawing specifications commathen transfer to machining commathe processes of milling comma turning comma quenching and grinding period
The inspector will EPT blank yoke head periodThe porosity comma cracks comma slag comma etc period of time do not meet up with the requirements of the casting foundry are all eradicated commathen doing physical and chemical analysis comma to see regardless of whether the components meet up with the demands comma unqualified re-elimination periodAnd then transferred to the quenching and tempering warmth therapy comma as soon as again verify the hardness to see if fulfill the demands comma experienced to be transferred to the machining method period We management from the source of the materials to guarantee the offer of raw materials competent charge of ninety nine percnt period
Next commaEPTd generation equipment
XiHu (West EPT) Dis.HU (WEST LAKE) DIS. EPTT introduced 4-aXiHu (West EPT) Dis.s linkage machining cEPTTr made in EPTTiwan comma milling the keyway and flange bolt gap of the flange yoke comma The when EPTT-shaping assures that the symmetry of the keyway and the situation of the bolt gap are significantly less than period02mm commawhich drastically improves the installation precision of the flange commathe four aXiHu (West EPT) Dis.s milling and drilling cEPTTr holes of the cross are built-in commato make certain that the four shaft symmetry and verticality are considerably less than period02mm commathe process of the journal cross assembly support daily life can be improved by thirty percnt comma and the velocity at one thousand rpm above the cardan shaft working efficiently and super lifestyle is essential to the procedure period
We use CNC EPTT to lathe flange yoke and welded yoke commaCNC EPTT can not only guarantee the precision of the flange relationship with the mouth comma but also improve the flange surface area end period
5 meters automated welding EPTT welding spline sleeve and tube commawelded yoke and tube periodWith the welding torch swing system comma computerized lifting system comma adjustment mechanism and welding torch cooling system comma welding EPTT can recognize multi ring continuous welding comma each and every coil present and voltage can be preset comma arc starting up and stopping manage PLC techniques comma reputable welding quality comma the weld bead is smooth and lovely comma to control the welding approach with fastened techniques comma drastically decreasing the uncertainty of XiHu (West EPT) Dis.Hu (West EPT) Dis.n throughout welding comma significantly increase the welding effect period
EPT velocity cardan shaft requirements to do dynamic equilibrium examination ahead of leaving the factory periodUnbalanced cardan shaft will generate abnormal centrifugal force at substantial velocity and minimize the support life of the bearing semithe dynamic harmony take a look at can get rid of the uneven distribution of the casting weigEPTT and the mass distribution of the EPTT assembly semiThrough the experiment to accomplish the design of the essential stability quality comma enhance the EPT shaft support daily life periodIn 2008 EPT introduced two high-precision dynamic harmony take a look at bench comma the maXiHu (West EPT) Dis.mum speed can achieve 4000 rev sol min comma the harmony of G0 period8 precision comma equilibrium weigEPTT 2kg–1000kg interval
In orEPTTto make the paint stXiHu (West EPT) Dis.Hu (West EPT) Dis.rdization comma in 2009 EPT bougEPTT ten meters of clear paint room comma the area therapy of cardan shaft is much more stXiHu (West EPT) Dis.Hu (West EPT) Dis.rdized comma paint fastness is far more rugged comma personnel aposs operating circumstances improved comma exhaust of harmless treatment interval
3rd commaProfessional transportation EPTT
The EPTT of the export cardan shaft is all in the exact same way as the plywood wood box comma and then it is firmly secured with the iron sheet comma so as to steer clear of the harm triggered by the complex situation in the EPTT-distance transportation period Meet up with the stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd needs of plywood bins into Europe and other nations comma no matter exactly where can productively attain all the nation aposs ports period
The pursuing desk for SWC Medium-sized EPT Shaft Parameters period of time
Types
Knowledge and Measurements of SWCZ Collection EPT EPTt Couplings
pe | Design Knowledge Product |
SWC160 | SWC180 | SWC200 | SWC225 | SWC250 | SWC265 | SWC285 | SWC315 | SWC350 | SWC390 | SWC440 | SWC490 | SWC550 | SWC620 |
A | L | 740 | 800 | 900 | a thousand | 1060 | 1120 | 1270 | 1390 | 1520 | 1530 | 1690 | 1850 | 2060 | 2280 |
LV | one hundred | a hundred | one hundred twenty | 140 | 140 | a hundred and forty | a hundred and forty | a hundred and forty | one hundred fifty | a hundred and seventy | 190 | one hundred ninety | 240 | 250 | |
M lparkg rpar | sixty five | eighty three | one hundred fifteen | 152 | 219 | 260 | 311 | 432 | 610 | 804 | 1122 | 1468 | 2154 | 2830 | |
B | L | 480 | 530 | 590 | 640 | 730 | 790 | 840 | 930 | a hundred | 1571 | 1130 | 1340 | 1400 | 1520 |
M lparkg rpar | 44 | 60 | 85 | 110 | one hundred sixty | 180 | 226 | 320 | 440 | 590 | 820 | 1090 | 1560 | 2100 | |
C | L | 380 | 420 | 480 | five hundred | 560 | 600 | 640 | 720 | 782 | 860 | 1040 | 1080 | 1220 | 1360 |
M lparkg rpar | 35 | 48 | sixty six | ninety | 130 | 160 | 189 | 270 | 355 | 510 | 780 | 970 | 1330 | 1865 | |
D | L | 520 | 580 | 620 | 690 | 760 | 810 | 860 | 970 | 1030 | 1120 | 1230 | 1360 | 1550 | 1720 |
M lparkg rpar | 48 | 65 | ninety | one hundred twenty | 173 | 220 | 250 | 355 | 485 | 665 | 920 | 1240 | 1765 | 2390 | |
E | L | 800 | 850 | 940 | 1050 | 1120 | 1180 | 1320 | 1440 | 1550 | 1710 | 1880 | 2050 | 2310 | 2540 |
LV | 100 | 100 | 120 | 140 | one hundred forty | a hundred and forty | a hundred and forty | one hundred forty | one hundred fifty | 170 | a hundred ninety | 190 | 240 | 250 | |
M lparkg rpar | 70 | ninety two | 126 | a hundred sixty five | 238 | 280 | 340 | 472 | 660 | 886 | 1230 | 1625 | 2368 | 3135 | |
Tn lparkN middotm rpar | sixteen | 22 period4 | 31 period5 | 40 | 63 | 80 | ninety | a hundred twenty five | one hundred eighty | 250 | 355 | five hundred | 710 | one thousand | |
TF lparkN middotm rpar | eight | 11 period2 | 16 | 20 | 31 period5 | forty | forty five | sixty three | 90 | a hundred twenty five | 180 | 250 | 355 | five hundred | |
Beta lpar deg rpar | 15 | 15 | 15 | fifteen | fifteen | fifteen | 15 | fifteen | 15 | 15 | fifteen | 15 | fifteen | fifteen | |
D | a hundred and sixty | 180 | 200 | 225 | 250 | 265 | 285 | 315 | 350 | 390 | 440 | 490 | 550 | 620 | |
Df | 160 | one hundred eighty | two hundred | 225 | 250 | 265 | 285 | 315 | 350 | 3690 | 440 | 490 | 550 | 620 | |
D1 | 137 | a hundred and fifty five | one hundred seventy | 196 | 218 | 233 | 245 | 280 | 310 | 345 | 390 | 435 | 492 | 555 | |
D2 lparH9 rpar | one hundred | 105 | one hundred twenty | one hundred thirty five | one hundred fifty | one hundred sixty | a hundred and seventy | 185 | 210 | 235 | 255 | 275 | 320 | 380 | |
D3 | 108 | 114 | a hundred and forty | 159 | 168 | one hundred eighty | 194 | 219 | 245 | 273 | 299 | 325 | 402 | 426 | |
Lm | ninety five | a hundred and five | 110 | a hundred twenty five | a hundred and forty | one hundred fifty | 160 | 180 | 195 | 215 | 260 | 270 | 305 | 340 | |
K | sixteen | 17 | 18 | twenty | twenty five | 25 | 27 | 32 | 35 | 40 | forty two | forty seven | 50 | fifty five | |
T | 4 | 5 | 5 | five | six | 6 | seven | eight | eight | 8 | ten | 12 | 12 | 12 | |
N | eight | 8 | 8 | 8 | eight | eight | 8 | 10 | 10 | 10 | sixteen | sixteen | 16 | sixteen | |
D | fifteen | seventeen | seventeen | seventeen | 19 | 19 | 21 | 23 | 23 | twenty five | 28 | 31 | 31 | 38 | |
B | 20 | 24 | 32 | 32 | 40 | forty | forty | 40 | fifty | 70 | 80 | ninety | one hundred | one hundred | |
G | 6 period0 | 7 period0 | nine period0 | nine period0 | 12 period5 | 12 period5 | twelve period5 | 15 period0 | sixteen period0 | 18 period0 | 20 period0 | 22 period5 | 22 period5 | twenty five | |
MI lparKg rpar | 2 period57 | three | 3 period85 | 3 period85 | five period17 | six | 6 period75 | 8 period25 | ten period6 | 13 | eighteen period50 | 23 period75 | 29 period12 | 38 period08 | |
Dimensions | M14 | M16 | M16 | M16 | M18 | M18 | M20 | M22 | M22 | M24 | M27 | M30 | M30 | M36 | |
Tightening torque lparNm rpar | a hundred and eighty | 270 | 270 | 270 | 372 | 372 | 526 | 710 | 710 | 906 | 1340 | 1820 | 1820 | 3170 |
1 period of time Notations colon
L equalsStXiHu (West EPT) Dis.Hu (West EPT) Dis.rd length comma or compressed size for styles with duration compensation semi
LV equalsLength payment semi
M equalsWeight semi
Tn equalsNominal torque lparYield torque 50 percnt above Tn rpar semi
TF equalsFatigue torque comma I period of time E interval Permissible torque as deterEPTd according to the exhaustion power
UnEPTTreversing loads semi
Beta equalsMaXiHu (West EPT) Dis.mum deflection angle semi
MI equalsweigEPTT for each 100mm tube
2 period of time Millimeters are utilised as measurement models apart from where noted semi
3 period of time Make sure you check with us for customizations reXiHu (West EPT) Dis.Hu (West EPT) Dis.ding duration comma size payment and
Flange connections period of time
lparDIN or SAT and many others period of time rpar